Application Number 24/00770/FUL
Status Approved

Sign up to notifications on this planning application Back to search results New search

Planning Online Status


  • Application
    Valid
    23/10/2024
  • Consultation
    End
    02/04/2025
  • Committee
    Meeting
    N/A
  • Decision

    Approval
  • Decision
    Date
    20/06/2025
  • Appeal
    Started
    N/A
  • Appeal
    Decision
    N/A
Summary
Application Number 24/00770/FUL
Location Address 18 The Foregate WORCESTER WR1 3QF
Proposal Demolition of existing upper floors with the retention of ground floor as a restaurant. Construction of new upper floors (first, second and third floors) to create a mixed use of 8 co-living units (Use Class Sui Generis) and 3 self-contained residential units (Use Class C3).
Status Approval
Application Type Full planning permission
Appeal Decision N/A

Important Dates
Application Received Date 14/10/2024
Application Valid Date 23/10/2024
Consultation Start Date 21/10/2024
Site Visited / Site Notice Date 24/10/2024
Consultation End 02/04/2025
Advert Expiry 02/04/2025
Committee Date (if applicable)
Committee Agenda
Decision Date 20/06/2025

Further Information
Expected Decision Level Delegated
Case Officer Rebecca Marshall
Parish Worcester City
Ward Cathedral Ward
Applicant Mr MEHMET KAAN CAN
Agent Mr Nick Carroll, Nick Carroll Architects Ltd.
Agent Address 42 Broad Street Worcester WR1 3LR

Condition Details / Information Notes
The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
The development hereby permitted shall be carried out and completed in accordance with the following approved plans and associated documents and the specifications and recommendations contained therein, except where otherwise stipulated by conditions attached to this permission: Location Plan and Block Plans 2406-00 Proposed Ground and First Floor Plan 2406-01 Proposed Second and Third Floor Plan 2406-02 Existing floor plan 2406-03 Rev F1 Proposed and Existing Rear Elevations 2406-04 - Proposed Elevation 1 Proposed Front Elevation 2406-05 Rev F2 Proposed and Existing Front Elevation 2406-06 Rev F2 Planning Statement Design and Access Statement Heritage Statement Land Contamination Assessment Preliminary Roost Assessment Energy Statement Reason: To ensure compliance with the approved scheme.
No superstructure works shall take place until samples and full particulars of all external facing materials to be used in the construction of the development have been submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out other than in accordance with the approved details. Reason: To ensure a satisfactory external appearance of the development and that high quality materials and finishes are used, in accordance with Policy SWDP 21 of the South Worcestershire Development Plan (2016).
No superstructure works shall take place until detailed plans and sections of the proposed windows and doors at a scale of 1:20 together with details of proposed finishes have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policies SWDP 21 of the South Worcestershire Development Plan (2016).
The windows of the proposed development shall be set back a minimum of 75 mm from the edge of the brickwork around the window opening, unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policies SWDP 21 of the South Worcestershire Development Plan (2016).
(A) No development shall take place until a programme of archaeological work, including a Written Scheme of Investigation, has been submitted to and approved by the local planning authority in writing. The scheme shall include an assessment of significance and research questions; and: 1) The programme and methodology of site investigation and recording. 2) The programme for post investigation assessment. 3) Provision to be made for analysis of the site investigation and recording. 4) Provision to be made for publication and dissemination of the analysis and records of the site investigation. 5) Provision to be made for archive deposition of the analysis and records of the site investigation. 6) Nomination of a competent person or persons/organisation to undertake the works set out within the Written Scheme of Investigation. (B) The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the Written Scheme of Investigation approved under condition (A) and the provision made for analysis, publication and dissemination of results and archive deposition has been secured. Reason: In accordance with the requirements of paragraphs 207, 210, 216 and 218 of the National Planning Policy Framework (as amended) and SWDP 6 & 24 of the South Worcestershire Development Plan 2016.
Before the occupation of the development hereby permitted, details of a bat box to be installed shall be submitted to and approved in writing by the Local Planning Authority.  The details to be submitted shall include an implementation timetable. The bat box shall be provided in accordance with the approved details and in accordance with the approved timetable and shall be retained for the lifetime of the development. Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan.
The development hereby approved shall not be occupied until details of the design, implementation, maintenance and management of sustainable urban drainage/surface water drainage works have been submitted to and approved in writing by the Local Planning Authority. The submitted details shall: • provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters; • include a timetable for its implementation; and • provide a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public authority or statutory undertaker and any other arrangements to secure the operation of the scheme throughout its lifetime. The development shall be carried out, and the drainage maintained/managed, in accordance with the approved details. Reason: To ensure the proposed development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with policies SWDP28 and SWDP29 of the South Worcestershire Development Plan (2016).
The development hereby permitted shall not be occupied/first used until full details of all foul and surface water drainage systems to serve the development have been submitted to and approved in writing by the Local Planning Authority. The approved drainage works shall be implemented in accordance with the approved details before the first occupation/use of the development hereby permitted and shall be retained thereafter. Reason: To ensure development would not result in unacceptable risk of pollution or harm to the environment and to ensure the proposed development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with policies SWDP28, SWDP29 and SWDP 30 of the South Worcestershire Development Plan.
The development hereby permitted shall not be occupied until sheltered, secure and accessible cycle parking has been provided in accordance with details to be submitted to and approved in writing by the Local Planning Authority. Thereafter the provision shall be retained for the purposes of cycle parking only at all times. Reason: To comply with the Council’s parking standards.
The development hereby approved shall not commence until a Construction Environmental Management Plan has been submitted to and approved in writing by the Local Planning Authority. This shall include but not be limited to the following:- • Duration of works; • Size, type and frequency of deliveries to include HGV routing; • The hours that delivery vehicles will be permitted to arrive and depart, and arrangements for unloading and manoeuvring; • Traffic management measures for construction vehicles on The Foregate to include temporary signage and the use of a banksman to oversee all vehicular manoeuvres; • Details of permitting for signage, skips and scaffolding, footway and road closures, road space booking as required; • Measures to ensure that mud or other detritus is not deposited on the public highway; • Details of site operative parking, material storage areas and the location of site operatives facilities as required; • Measures to demonstrate that those immediately affected by the construction works will be kept informed and due consideration and courtesy will be shown to the local community. • Contractors should be registered with the Considerate Constructors scheme and comply with the code of conduct in full. The measures set out in the approved Plan shall be carried out and complied with in full during the construction of the development hereby approved. Reason: To ensure the provision of adequate on-site facilities and in the interests of highway safety.
The development hereby approved shall not be occupied until a residential Travel Information Pack promoting sustainable forms of access to the development, has been submitted to and approved in writing by the Local Planning Authority. The pack shall be provided to each resident at the point of occupation. Reason: To reduce vehicle movements and promote sustainable access.
The development hereby approved shall not be occupied until details of the refuse and servicing strategy for the proposed dwellings, have been submitted to and approved in writing by the Local Planning Authority. The approved details shall be fully implemented prior to first occupation and shall be operational for the lifetime of the development. Reason: To ensure adequate on-site provision.
No demolition, construction or engineering works shall take place on any Sunday, Bank Holiday or Public Holiday, and such works shall only take place between the hours of 08.00 to 18.00 weekdays and 08.00 to 14.00 Saturdays. No plant, machinery or equipment associated with such works shall be started up or operational on the development site outside of these permitted hours. Reason: To mitigate the impact of construction to neighbouring residents in accordance with Policy SWDP 21 of the South Worcestershire Development Plan (2016) and the aims and objectives of the National Planning Policy Framework.
Prior to the commencement of the development, a Nuisance Management Plan detailing the proposed measures to monitor and mitigate emissions of noise, vibration (piling) and dust during the construction phase shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To safeguard neighbouring amenity during the construction phase.
Prior to occupation of the development hereby permitted, a satisfactory Secured by Design inspection must take place and the resulting Secured by Design certificate shall be submitted to and approved by the local planning authority in writing. Reason: To ensure that the development maintains and enhances community safety SWDP 21 of the South Worcestershire Development Plan (2016).
The apartments and co-living units hereby approved shall have an electronic door control system that meets the SBD specification. The delivery of mail should follow the guidelines outlined in the SBD guide. All residential doors should be dual certified for both security and fire, the doors should meet security standard PAS24:2022 or equivalent and have the appropriate fire and smoke rating. Reason: In the interests of security and safety.
No superstructure works shall commence until details to incorporate within the development hereby approved energy generation from renewable or low carbon sources equivalent to at least 10% of predicted energy requirements have been submitted to and agreed in writing by the Local Planning Authority. The approved details shall be implemented and operational prior to the first occupation of the development. Reason: To ensure the development meets the requirements of Policy SWDP 27 and associated guidance in the Renewable and Low Carbon Supplementary Planning Document and the aims and objectives of the National Planning Policy Framework to mitigate the impact of climate change.
The 8 co-living units and associated communal space hereby approved shall be occupied solely as a co-living accommodation and shall not be used for any other residential purpose, including as a House in Multiple Occupation (HMO) or self-contained flats, without planning permission first being obtained from the Local Planning Authority. Reason: To ensure the development is occupied in accordance with the approved use.
The development hereby approved shall be occupied in accordance with the following minimum tenancy periods: • Rooms 1 to 3 shall be occupied for short-term residential letting with a minimum tenancy length of no less than 3 consecutive days. • Rooms 4 to 8 shall be occupied for longer-term residential letting with a minimum tenancy length of no less than 6 consecutive months. No room shall be occupied outside of these specified tenancy terms unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure the development provides an appropriate mix of residential and visitor accommodation, protects residential amenity, and maintains a balanced and sustainable community, in accordance with SWDP 14 (Market Housing Mix) and SWDP 21 (Design) of the South Worcestershire Development Plan.
A register of all tenancies shall be maintained at the property and shall be made available to the Local Planning Authority within 7 days of a written request. The register shall include the following details for each tenancy: • The name of the tenant(s) • The room number occupied • The start and end dates of the tenancy • The duration of stay The register shall be kept up to date at all times and retained for a minimum period of 3 years from the date of each tenancy. Reason: To enable the Local Planning Authority to monitor and enforce compliance with the approved occupation arrangements, in the interests of residential amenity and in accordance with Policies SWDP 14 and SWDP 21 of the South Worcestershire Development Plan.
Prior to first occupation of the 8 co-living units hereby approved, a detailed Co-Living Management Plan shall be submitted to and approved in writing by the Local Planning Authority. This plan shall include: - Arrangements for on-site management and maintenance. - Measures to prevent and address anti-social behaviour. - Waste management and recycling strategy. - Fire safety and emergency procedures. - Access control and security measures. The Co-living Management Plan shall be subject to an annual review to ensure compliance with the approved Management Plan. Any revised Co-living Management Plan shall be provided to the Local Planning Authority. Reason: To ensure satisfactory site management and maintence, and appropriate safety and security measures.
The communal facilities, including but not limited to shared kitchen areas, co-working spaces, laundry rooms, and lounges, shall be maintained and remain accessible to all residents at all times. These facilities shall not be converted into additional residential accommodation. Reason: To ensure the occupation of the development is in accordance with the approved plans.
The co-living accommodation hereby approved shall remain under single ownership and shall not be subdivided or sold as individual units without prior written approval from the Local Planning Authority. Reason: To ensure compliance with the approved plans.

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.

Document Download Tips

  • In order to view the documents please ensure you have ticked the Copyright Notice box above.
  • In order to view PDF documents, you will need to have the free Adobe Acrobat Reader software installed on your computer. Click here to download.
  • To view individual documents click on the 'Document Type' on the row you require and the document will open as an Adobe Acrobat pdf.
  • To download multiple documents in one go, tick all the boxes relating to the documents you wish to view and click Download selected files button.
  • If you wish to download ALL documents place a tick in the box in the header row and click 'Download Selected Files' button.
  • Note: some devices such as iPads that use iOS browsers do not have the standard capability to download multiple files as a default function. If you are experiencing difficulties you may need to download a free application to enable you to do this - known as a zip file. Go to the AppStore to download a zip file ‘app’.

How to reorder or group rows

Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.

Document Type Date Description File Size Drawing/Rev Number
Application Documents
Plans
Representations
Decision
Planning Application Documents

Consultation Responses

Neighbour List


In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


Address Sent Reply Received
Flat 9 59 Bromyard Road WORCESTER WR2 5BZ 04/11/2024
5 Angel Street WORCESTER WR1 3QT 23/10/2024 21/03/2025
1 Angel Street WORCESTER WR1 3QT 23/10/2024
1 Berkeley Court The Foregate WORCESTER WR1 3QG 23/10/2024
1 Shaw Street Worcester WR1 3QQ 23/10/2024
1-3 St Nicholas Street WORCESTER WR1 1UW 23/10/2024
10 Angel Street WORCESTER WR1 3QT 23/10/2024
11 The Foregate WORCESTER WR1 3QD 23/10/2024
12A The Foregate Worcester WR1 3QD 23/10/2024
13 The Foregate WORCESTER WR1 3QD 23/10/2024
14 The Foregate WORCESTER WR1 3QD 23/10/2024
15 The Foregate WORCESTER WR1 3QD 23/10/2024
16 The Foregate WORCESTER WR1 3QD 23/10/2024
17 The Foregate WORCESTER WR1 3QF 23/10/2024
18A The Foregate WORCESTER WR1 3QF 23/10/2024
19 The Foregate WORCESTER WR1 3QF 23/10/2024
1A Angel Street WORCESTER WR1 3QT 23/10/2024
1B Angel Street Worcester WR1 3QT 23/10/2024
2 Berkeley Court The Foregate WORCESTER WR1 3QG 23/10/2024
20 The Cross Worcester WR1 3PZ 23/10/2024
20 The Hopmarket The Foregate WORCESTER WR1 1DL 23/10/2024
21 The Cross Worcester WR1 3PZ 23/10/2024
21 The Hopmarket The Foregate WORCESTER WR1 1DL 23/10/2024
22 The Cross Worcester WR1 3PZ 23/10/2024
22 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
23 The Cross WORCESTER WR1 3PZ 23/10/2024
24 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
24-25 The Cross WORCESTER WR1 3PZ 23/10/2024
25 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
26 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
27 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
28 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
29 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
3 Angel Street WORCESTER WR1 3QT 23/10/2024
3 Berkeley Court The Foregate WORCESTER WR1 3QG 23/10/2024
30 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
4 Berkeley Court The Foregate WORCESTER WR1 3QG 23/10/2024
5 Berkeley Court The Foregate WORCESTER WR1 3QG 23/10/2024
57 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
58 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
59 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
6 Berkeley Court The Foregate WORCESTER WR1 3QG 23/10/2024
60 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
61 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
62 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
63 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
64 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
65 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
66 Foregate Street Worcester WR1 1DX 23/10/2024
7-9 Angel Street WORCESTER WR1 3QT 23/10/2024
8 Angel Street WORCESTER WR1 3QT 23/10/2024
Community Room Berkeley Court The Foregate Worcester 23/10/2024
First Floor 23 The Cross WORCESTER WR1 3PZ 23/10/2024
Flat 1 12A The Foregate WORCESTER WR1 3QD 23/10/2024
Flat 1 1B Angel Street WORCESTER WR1 3QT 23/10/2024
Flat 1 21 The Cross WORCESTER WR1 3PZ 23/10/2024
Flat 1 7-9 Angel Street WORCESTER WR1 3QT 23/10/2024
Flat 2 12A The Foregate WORCESTER WR1 3QD 23/10/2024
Flat 2 1B Angel Street WORCESTER WR1 3QT 23/10/2024
Flat 2 21 The Cross WORCESTER WR1 3PZ 23/10/2024
Flat 2 7-9 Angel Street WORCESTER WR1 3QT 23/10/2024
Flat 3 12A The Foregate WORCESTER WR1 3QD 23/10/2024
Flat 3 21 The Cross WORCESTER WR1 3PZ 23/10/2024
Flat 3 7-9 Angel Street WORCESTER WR1 3QT 23/10/2024
Flat 4 12A The Foregate WORCESTER WR1 3QD 23/10/2024
Flat 4 7-9 Angel Street WORCESTER WR1 3QT 23/10/2024
Flat 5 7-9 Angel Street WORCESTER WR1 3QT 23/10/2024
Flat 6 7-9 Angel Street WORCESTER WR1 3QT 23/10/2024
Flat At 1-3 St Nicholas Street WORCESTER WR1 1UW 23/10/2024
Flat At 22 The Cross WORCESTER WR1 3PZ 23/10/2024
Flat At 5 Angel Street WORCESTER WR1 3QT 23/10/2024
Flat At The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024
Ground And First Floors At 20 The Cross WORCESTER WR1 3PZ 23/10/2024
Ground Floor 12 The Foregate WORCESTER WR1 3QD 23/10/2024
Ground Floor 23 The Cross WORCESTER WR1 3PZ 23/10/2024
Ground Floor 66 Foregate Street WORCESTER WR1 1DX 23/10/2024
Ground Floor Shop 21 The Cross WORCESTER WR1 3PZ 23/10/2024
Ground Floor Shop At 22 The Cross WORCESTER WR1 3PZ 23/10/2024
Hairdressers Above 10 Angel Street WORCESTER WR1 3QT 23/10/2024
Hmo Accomodation Above 19 The Foregate Worcester WR1 3QF 23/10/2024
Room 1 19 The Foregate WORCESTER WR1 3QF 23/10/2024
Room 2 19 The Foregate WORCESTER WR1 3QF 23/10/2024
Room 3 19 The Foregate WORCESTER WR1 3QF 23/10/2024
Room 4 19 The Foregate WORCESTER WR1 3QF 23/10/2024
Room 5 19 The Foregate WORCESTER WR1 3QF 23/10/2024
Room 6 19 The Foregate WORCESTER WR1 3QF 23/10/2024
Room 7 19 The Foregate WORCESTER WR1 3QF 23/10/2024
Room 8 19 The Foregate WORCESTER WR1 3QF 23/10/2024
Room 9 19 The Foregate WORCESTER WR1 3QF 23/10/2024
Second And Third Floor Offices At 20 The Cross WORCESTER WR1 3PZ 23/10/2024
The Cricketers Arms 6 Angel Street WORCESTER WR1 3QT 23/10/2024
The Horn And Trumpet 12 Angel Street WORCESTER WR1 3QT 23/10/2024
Third Floor Rear Offices At 1 Shaw Street WORCESTER WR1 3QQ 23/10/2024
23 The Hopmarket The Foregate WORCESTER WR1 1DD 23/10/2024 26/10/2024
Flat 2 The Horn And Trumpet 12 Angel Street WORCESTER WR1 3QT 27/02/2025
Flat At The Cricketers Arms 6 Angel Street WORCESTER WR1 3QT 27/02/2025
Flat At The Horn And Trumpet 12 Angel Street WORCESTER WR1 3QT 27/02/2025
Kateryn Heywood House Berkeley Court The Foregate WORCESTER WR1 3QG 27/02/2025
The Gate House Berkeley Court The Foregate WORCESTER WR1 3QG 27/02/2025

Consultee List


Name Organisation Sent Reply Due Reply Received
Transport Planning Unit 21/10/2024 04/11/2024
(Air Quality) Worcestershire Regulatory Services 21/10/2024 04/11/2024
(Nuisance) Worcestershire Regulatory Services 21/10/2024 04/11/2024
Aidan Smyth Archaeology 21/10/2024 04/11/2024
Chris Dobbs Landscape Officer 21/10/2024 04/11/2024
City Centre City Centre Manager (consult shopping areas) 21/10/2024 04/11/2024
Councillor Adam Scott(Cathedral) 21/10/2024 04/11/2024
Councillor Lynn Denham (Cathedral) 21/10/2024 04/11/2024
Jacqueline Godfrey Hunt West Mercia Police 21/10/2024 04/11/2024
Michelle Hackett Refuse Management 21/10/2024 04/11/2024
Paul Collins Conservation Officer 21/10/2024 04/11/2024
The Chief Fire Officer Hereford & Worcestershire Fire & Rescue Service 21/10/2024 04/11/2024
Heather Barrett Civic Society 21/02/2025 28/02/2025
Transport Planning Unit 27/02/2025 06/03/2025
(Air Quality) Worcestershire Regulatory Services 27/02/2025 06/03/2025
(Nuisance) Worcestershire Regulatory Services 27/02/2025 06/03/2025
Aidan Smyth Archaeology 27/02/2025 06/03/2025
Charles Potterton Conservation Area Advisory Committee 27/02/2025 06/03/2025
Chris Dobbs Landscape Officer 27/02/2025 06/03/2025
City Centre City Centre Manager (consult shopping areas) 27/02/2025 06/03/2025
Councillor Adam Scott(Cathedral) 27/02/2025 06/03/2025
Councillor Lynn Denham (Cathedral) 27/02/2025 06/03/2025
Heather Barrett Civic Society 27/02/2025 20/03/2025
Jacqueline Godfrey Hunt West Mercia Police 27/02/2025 06/03/2025
Michelle Hackett Refuse Management 27/02/2025 06/03/2025
Paul Collins Conservation Officer 27/02/2025 06/03/2025
The Chief Fire Officer Hereford & Worcestershire Fire & Rescue Service 27/02/2025 06/03/2025
Transport Planning Unit 04/03/2025 11/03/2025
(Air Quality) Worcestershire Regulatory Services 04/03/2025 11/03/2025
(Nuisance) Worcestershire Regulatory Services 04/03/2025 11/03/2025
Aidan Smyth Archaeology 04/03/2025 11/03/2025
Charles Potterton Conservation Area Advisory Committee 04/03/2025 11/03/2025
Chris Dobbs Landscape Officer 04/03/2025 11/03/2025
City Centre City Centre Manager (consult shopping areas) 04/03/2025 11/03/2025
Councillor Adam Scott(Cathedral) 04/03/2025 11/03/2025
Councillor Lynn Denham (Cathedral) 04/03/2025 11/03/2025
Heather Barrett Civic Society 04/03/2025 11/03/2025
Jacqueline Godfrey Hunt West Mercia Police 04/03/2025 11/03/2025
Michelle Hackett Refuse Management 04/03/2025 11/03/2025
Paul Collins Conservation Officer 04/03/2025 11/03/2025
The Chief Fire Officer Hereford & Worcestershire Fire & Rescue Service 04/03/2025 11/03/2025

Constraints List


Constraints List
SWDP 24: Archaeological Sensitive Areas (ASA)
SWDP 6: Conservation Area
SWDP 2: Development Boundary
SWDP 5: Urban - Unsurveyed
SWDP 10: Shopping Centres
Air Quality Management Area: Worcester City AQMA
No associated appeals